Follow this list on deployment day so nothing is missed between unhitching and handing over a working system. Most units are recording within 15 to 20 minutes; aiming and alert tuning take a little longer.
Deployment day setup checklist0 / 19
Position and stabilise
Raise and aim
Connect and test
Hand over
How to use it
Keep a copy with the deployment record. Review the first night's footage and alerts the next morning and adjust zones and aiming as needed.
Why each section matters
- Position and stabilise: 4 checks, from position checked against the plan, sky and signal to trailer level both ways, every jack carrying load.
- Raise and aim: 5 checks, from no overhead hazards; wind within rating to lights aimed and dimming schedule set.
- Connect and test: 6 checks, from unit named by site and position in the app to power status normal.
- Hand over: 4 checks, from privacy and monitoring signs posted to condition photos taken.