Custom Security Trailers
Industry guide · Construction

Monitoring and response for construction sites

Setting up alerts, live monitoring and response plans for trailers at construction sites: who watches, what they do and how incidents are recorded.

ConstructionMonitoring and response

Construction sites have legitimate after-hours activity: concrete pours, deliveries, security patrols and staff returning for tools. Give the monitoring centre a schedule of expected work and a list of authorised vehicles, and update it weekly. Agree how operators should respond to a person in the compound versus a vehicle at the gate. For larger projects, set up a daily summary to the site superintendent with any incidents and power or signal warnings, so issues are fixed during working hours.

Construction at a glance
Normal after-hours activity
Usually empty from evening to early morning, apart from occasional concrete pours, deliveries and patrols.
Who responds
A monitoring centre, the site superintendent or a keyholder, and local police for verified intrusions.

What is at risk at construction sites

  • Copper wire, cable reels and transformers stolen from laydown areas
  • Tools and small equipment taken from containers and gang boxes
  • Fuel siphoned from machines and tanks
  • Vandalism and trespass, especially in partly built structures

Models that suit construction sites

Recommended modelsFrom the catalogue
Sentry S4Covers a full perimeter with PTZ, fixed cameras and talk-down; the default for most sites
Connectivity: 5G / LTE router, optional satellite
Recording: On-board NVR, 8 TB, AI analytics
Overwatch O6One unit for large laydown areas and yards up to the catalogue's 5 acres
Connectivity: 5G / LTE, satellite failover
Recording: On-board NVR, 16 TB
Beacon LC ComboLights the compound and records it in colour
Connectivity: LTE router
Recording: On-board NVR, 4 TB
Fieldgrid P10Replaces a diesel genset for the site trailer and tool charging

Every model is available with solar, methanol fuel cell, 120 V shore power or diesel generator power. Specifications are for the standard build.

A step-by-step approach

An alert is only useful if the right person sees it and knows what to do. Good monitoring combines accurate analytics, a written response plan and records of every event.

  1. Choose who watches: your staff, a monitoring centre or both
  2. Set analytics zones and schedules around normal activity
  3. Write responses for each event type and an ordered call list
  4. Agree how police are contacted with verified video
  5. Log every event and review monthly

More guides for construction

Monitoring and response in other industries

Ready to spec a trailer for your site?

Tell us about the site, the season and what you need to protect. A specialist replies with a priced spec sheet, usually within one business day.