What you will learn
- Check a planned position against five practical tests
- Recognise overhead and ground hazards
- Know when to move the trailer before setting up
The security plan gives a planned position, but sites change between the plan and the delivery. Ten minutes checking the spot before dropping the jacks saves an hour of moving a set-up trailer later.
Step by step
Check the view
Stand at the spot and look at the gates, fences and assets the trailer is meant to cover. Note anything that blocks the view now, such as a new stockpile or parked equipment.
Check the sky
For solar units, the panels need an open view to the south (in the northern hemisphere). Buildings, trees or a crane parked to the south can shade the array for hours.
Check signal
Open a speed test on a phone at the spot, ideally on the same carrier as the trailer. Signal improves with mast height, but a dead zone at ground level is a warning.
Look up
Find power lines, tree branches and building overhangs. The raised mast must keep well clear of overhead lines, including when it sways.
Check the ground
Look for firm, level ground. Soft fill, frozen ground that will thaw, and slopes need pads or a different spot.
On-site checklist
Use this list on site. Ticks are saved in this browser.
Check your understanding
Answer the questions, then check. Get them all right to mark this lesson as passed on the course page.