Custom Security Trailers
Industry guide · Mining and quarries

Solar and backup power planning for mines and quarries

How to power security, light and comms trailers at mines and quarries: solar, methanol fuel cell, 120 V shore power or diesel, and how to size for the load.

Mining and quarriesPower planning

Long shifts and high-output lighting make hybrid units the norm at mines, and fuel deliveries are already routine, so diesel is easy to supply. The H6's 40 gal / 150 L tank is rated at about 30 days in typical use. Where several towers and cameras cluster around a plant or camp, a Fieldgrid P20 Hybrid can power them from one place with cam-lock distribution and far fewer generator hours.

Mining and quarries at a glance
Power on site
Site power exists but may be far from where units are needed; fuel is routine.
Seasonal pattern
Extreme cold and long nights in the north; dust year-round.

What is at risk at mines and quarries

  • Fuel, copper and parts theft from stores and equipment parks
  • Trespass into pits, stockpiles and highwall areas where people can be badly hurt
  • Night shift safety, which depends on strong lighting
  • Weak communications between pit, plant and office

Models that suit mines and quarries

Recommended modelsFrom the catalogue
Beacon H6 Hybrid120,000 lumens on a 30 ft mast with an 8 kW auto-start generator
Battery: 20.5 kWh LiFePO₄
Solar: 1,600 W monocrystalline
Sentry S4X HybridFull camera and talk-down package with generator backup for winters
Battery: 15.4 kWh LiFePO₄
Solar: 1,200 W monocrystalline
Longwatch R4Kilometre-range radar and thermal across large open sites
Battery: 25.6 kWh LiFePO₄
Solar: 1,600 W monocrystalline
Relay R3Boosted cellular, satellite and mesh for sites without signal
Battery: 15.4 kWh LiFePO₄
Solar: 1,200 W monocrystalline

Every model is available with solar, methanol fuel cell, 120 V shore power or diesel generator power. Specifications are for the standard build.

A step-by-step approach

Every trailer in the range runs from a LiFePO4 battery charged by solar, a methanol fuel cell, 120 V shore power or a diesel generator. The right choice depends on the load, the darkest month on site, whether an outlet is nearby, and how often someone can visit.

  1. Total the daily energy use of each unit
  2. Check solar harvest in the worst month of the deployment
  3. Compare with battery autonomy and the longest likely grey spell
  4. Look for an outlet within reach for shore power
  5. Choose backup (fuel cell or generator) where solar falls short

More guides for mining and quarries

Power planning in other industries

Ready to spec a trailer for your site?

Tell us about the site, the season and what you need to protect. A specialist replies with a priced spec sheet, usually within one business day.